Traffic

  • CONSTRUCTION: Villanova, I-476 Blue Route - SB

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: Philadelphia, RT-1 Roosevelt Blvd - NB

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • ACCIDENT_OVERTURNED_TRUCK: Thorofare, I-295 - NB

    at RT-44 (#21) - Overturned Truck - right lane blocked - The off ramp to Exit 21: Delaware St/Rt 640 is blocked. In addition, the off ramp to Exit 22:Hessian Ave/Rt 642 is blocked. Avoid the area. Alternate: New Jersey Turnpike or Rt 45 (Mantua Pike)

    09/02/2014 09:45:46 AM

  • ACCIDENT: Philadelphia Metro Area, RT-63 Woodhaven Rd - EB

    at Thornton Rd - Accident - 2 left lanes blocked

    09/02/2014 10:16:37 AM

  • ACCIDENT: Tinicum, I-95 - SB

    near Philadelphia Int'l Airport (#12) - Accident - left lane blocked

    09/02/2014 10:21:34 AM

  • CONSTRUCTION: Holmesburg, Wissinoming St

    between Bleigh Ave and Cottman Ave - Construction blocking one lane for island removal until October

    08/04/2014 11:24:58 AM

  • CONSTRUCTION: Bear, RT-896

    at the Summit Bridge - Construction blocking the right lane in each direction until October 30th

    07/04/2014 05:31:34 AM

  • CONSTRUCTION: Upper Darby Twp, Providence Rd

    between Baltimroe Pike and Bishop Ave - Construction - the road is scheduled to be closed weekdays from 9am until 3pm until December 15th for water main replacement - Alternate: Baltimore Pike

    08/22/2014 11:15:47 AM

  • CONSTRUCTION: Haverford Twp, Burmont Rd

    between RT-1 (Township Line Rd) and Steel Rd - Construction - the road is scheduled to be closed weekdays from 9am until 3pm until October 31st - Alternate: Warrior Rd

    07/24/2014 11:45:12 AM

  • CONSTRUCTION: Upper Uwchlan Twp, Dorlans Mill Rd

    is closed between Shelmire Rd - and RT-282 (Creek Rd) - Construction until mid-September for bridge repair - Alternate: Dowlin Forge Rd

    06/20/2014 12:26:00 PM

  • ACCIDENT: Plymouth, Ridge Pike

    at Butler Pike - Accident

    09/02/2014 10:47:55 AM

  • ACCIDENT: Midvale, WB Rt 273 (Christiana Rd)

    at Airport Rd (Rt 58) - Accident

    09/02/2014 10:44:24 AM

  • CONSTRUCTION: Olney, Olney Ave

    between Marshall St and 5th St - Construction - the road is scheduled to be closed daily from 7am until 6pm until September 12th for water main repair - Alternate: Tabor Rd

    07/07/2014 07:33:05 AM

  • CONSTRUCTION: Kensington, B St Bridge

    between Somerset St and Gurney St - Construction - road closed - until mid-September - Alternate: A St

    08/19/2014 05:04:56 PM

  • CONSTRUCTION: Pocopson Twp, Lenape-Unionville Rd

    is closed between RT-52 (Lenape Rd) - and Locust Grove Rd - Construction until September 29th for road reconstruction - Alternate: Locust Grove Rd

    04/14/2014 01:04:14 PM

  • CONSTRUCTION: Valley Forge Park, County Line Rd

    between RT-23 and Gulph Rd - Construction - the road is scheduled to be closed from 7am Monday until 5pm Friday weekly until the end of September - Alternate: RT-23

    05/27/2014 11:51:20 AM

  • CONSTRUCTION: Port Richmond, Richmond St

    is closed between Cambria St and Lehigh Ave - Construction until December - Alternate: Thompson St or Belgrade St

    05/27/2014 11:45:21 AM

  • ROAD_WORK: Bristol, Bristol Pike (RT-13)

    between Bath Rd and Bristol Commerce Dr - Road Work RT-13 will be restricted to one lane in each direction for bridge reconstruction. One lane northbound and southbound will be maintained on the new northbound side of the highway. This pattern will remain in place until December.

    03/04/2014 04:51:57 AM

  • PLANNED_EVENT: Fairmount Park, Martin Luther King Jr Dr

    between Falls Bridge and Eakins Oval - Event - the road will be closed in both directions on Saturdays and Sundays from 6am until 5pm until the last weekend in October for recreational activities - the road will be reopened between Eakins Oval and the Sweetbriar cutoff at 12pm - Alternate: I-76 or Kelly Dr

    04/21/2014 11:20:24 AM

  • CONSTRUCTION: Fishtown, Marlborough Ave

    between Richmond St and Wildey St - Construction - the road is scheduled to be closed weekdays from 9am until 3pm - Alternate: Columbia Ave

    07/14/2014 11:20:14 AM

  • CONSTRUCTION: Fishtown, Shackamaxon Ave

    between Wildey St and Richmond St - Construction - the road is scheduled to be closed weekdays from 9am until 3pm - Alternate: Frankford Ave

    07/14/2014 11:18:56 AM

  • MASS_TRANSIT_MASS_TRANSIT: SEPTA, Inbound Media Elwyn Regional Rail Line

    between Elwyn and Center City Phila - Mass Transit - - operating with delays up to 20 minutes because of signal problems.

    09/02/2014 09:25:55 AM

  • MASS_TRANSIT_MASS_TRANSIT: SEPTA, Manayunk/Norristown Regional Rail Line

    between Center City Phila and Norristown - Mass Transit - Because of track work, a special schedule is now in effect through Sunday, Sept. 14th. Weekdays, most Center City-bound trains will depart from Main St, Norristown, Coshohocken, Spring Mill and Miquon stations about 5 minutes EARLIER than regularly scheduled. Weekends, Shuttle buses replace train service between Wissahickon Station and Elm Station. For more details, visit septa.org

    09/02/2014 05:24:26 AM

  • CONSTRUCTION: Franconia Twp, Broad St

    is closed between RT-113 and Cowpath Rd - Construction until November for intersection improvement - Alternate: RT-113

    06/13/2014 02:06:21 PM

  • CONSTRUCTION: Franconia Twp, Godshall Rd

    is closed between Lower Rd and Cowpath Rd - Construction until November for intersection improvement - Alternate: Allentown Rd

    06/13/2014 02:04:56 PM

  • CONSTRUCTION: Franconia Twp, Cowpath Rd

    is closed between RT-113 and Beck Rd - Construction until November for intersection improvement - Alternate: RT-113

    06/13/2014 02:03:38 PM

  • CONSTRUCTION: Upper Darby Twp, Garrett Rd

    between Morgan Ave and Lansdowne Ave - Construction - the road is scheduled to be closed weekdays from 9am until 3pm until September 30th for water main installation - Alternate: Baltimore Ave

    06/23/2014 11:28:47 AM

  • CONSTRUCTION: Middletown Twp, RT-213 (Maple Ave)

    is closed between Old Lincoln Hwy - and Bridgetown Pike - Construction until October 2016 - Alternate: Brownsville Rd

    07/18/2014 01:56:46 PM

  • CONSTRUCTION: I-476/Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476/Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476/Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476/Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476/Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476/Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • ACCIDENT: I-95

    near Philadelphia Int'l Airport (#12) - Accident - left lane blocked

    09/02/2014 10:21:34 AM

  • ACCIDENT: I-95

    near Philadelphia Int'l Airport (#12) - Accident - left lane blocked

    09/02/2014 10:21:34 AM

  • CONSTRUCTION: PA Tpk

    at Lebanon-lancaster Int/Exit 266 - Construction work.

    09/02/2014 10:47:23 AM

  • CONSTRUCTION: PA Tpk

    at Lebanon-lancaster Int/Exit 266 - Construction work.

    09/02/2014 10:47:23 AM

  • CONSTRUCTION: I-476/Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476/Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476/Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476/Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476/Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476/Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • ACCIDENT: I-95

    near Philadelphia Int'l Airport (#12) - Accident - left lane blocked

    09/02/2014 10:21:34 AM

  • ACCIDENT: I-95

    near Philadelphia Int'l Airport (#12) - Accident - left lane blocked

    09/02/2014 10:21:34 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • ACCIDENT: RT-63/Woodhaven Rd

    at Thornton Rd - Accident - 2 left lanes blocked

    09/02/2014 10:16:37 AM

  • ACCIDENT: RT-63/Woodhaven Rd

    at Thornton Rd - Accident - 2 left lanes blocked

    09/02/2014 10:16:37 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • CONSTRUCTION: RT-1/Roosevelt Blvd

    between 9th St and Southampton Rd - Construction - 3 lanes blocked - Milling and re-paving of the inner drive weeknights from 7 p.m. until 6 a.m. through the end of October. Use the outer drive.

    08/18/2014 03:46:01 AM

  • ACCIDENT: I-95

    near Philadelphia Int'l Airport (#12) - Accident - left lane blocked

    09/02/2014 10:21:34 AM

  • ACCIDENT: I-95

    near Philadelphia Int'l Airport (#12) - Accident - left lane blocked

    09/02/2014 10:21:34 AM

  • ACCIDENT: I-95

    near Philadelphia Int'l Airport (#12) - Accident - left lane blocked

    09/02/2014 10:21:34 AM

  • ACCIDENT: I-95

    near Philadelphia Int'l Airport (#12) - Accident - left lane blocked

    09/02/2014 10:21:34 AM

  • CONSTRUCTION: PA Tpk

    at Lebanon-lancaster Int/Exit 266 - Construction work.

    09/02/2014 10:47:23 AM

  • CONSTRUCTION: PA Tpk

    at Lebanon-lancaster Int/Exit 266 - Construction work.

    09/02/2014 10:47:23 AM

  • CONSTRUCTION: I-476 Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476 Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476 Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476 Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476 Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476 Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476 Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476 Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476 Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476 Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476 Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

  • CONSTRUCTION: I-476 Blue Route

    between St. Davids/Villanova (#13) and Broomall/Upper Darby (#9) - Construction - left lane blocked - until 3 p.m.

    09/02/2014 09:37:12 AM

Meet Jillian